Complete version log from initial prototype to current production build. Each version includes a sign-off box for internal approval.
Adds the Weekly Management Report feature and the HSEQ Manager role. The report is generated automatically from live system data and covers the previous 7 days of issues plus the next 7 days of risks, designed specifically for the Monday management meeting.
Complete rebuild of the Interactive Planner using a day-level data model. Engineers are allocated to specific calendar dates rather than week slots, enabling precise clash detection and accurate absence integration. Seeded with five live programme teams.
Introduced the day-level picker overlay to the legacy week-based planner and added absence-aware clash detection. Engineers cannot be double-booked on days where they are already allocated or marked absent.
Replaced placeholder data with realistic operative profiles, site records, UKAS entries and Papertrail records. Added the Absences module with a 5-week rolling calendar grid.
Added compliance auto-fill to workscope mobilisation forms and introduced the Audit Log with RAG status tracking for all 11 WO documents.
First working prototype. Established the core architecture: unified single-file HTML portal with role-based login, compliance dashboard, workscope pipeline and the legacy campaign planner.